BisonConvey

CONVEYOR PRODUCTS & PROJECT SUPPORT

CONVEYOR BELTS+IDLERS & PULLEYS+MINING SOLUTIONS+PORT LOGISTICS+CEMENT HANDLING+STEEL PROCESSING+BULK MATERIALS+ENGINEERING EXCELLENCE+CONVEYOR BELTS+IDLERS & PULLEYS+MINING SOLUTIONS+PORT LOGISTICS+CEMENT HANDLING+STEEL PROCESSING+BULK MATERIALS+ENGINEERING EXCELLENCE+
FABRIC BELTS+STEEL CORD BELTS+CHEVRON BELTS+SIDEWALL BELTS+DRIVE PULLEYS+IMPACT IDLERS+QUALITY CERTIFIED+GLOBAL EXPORT+FABRIC BELTS+STEEL CORD BELTS+CHEVRON BELTS+SIDEWALL BELTS+DRIVE PULLEYS+IMPACT IDLERS+QUALITY CERTIFIED+GLOBAL EXPORT+

FROM YOUR REQUIREMENTS TO AN AGREED SUPPLY SCOPE

01

Requirements & BOM

Input: application details, quantities, destination, BOM, drawing or replacement-part photos. Output: an item list and missing-information checklist for supplier review.

02

Specifications & deviations

Input: dimensions, interfaces, material and operating requirements. Output: supplier-confirmed options and recorded deviations to check before accepting a quote.

03

Optional sample review

Input: a sample request, drawing or approval criteria. Output: confirmation of sample feasibility, cost, timing and approval process if sampling is agreed. No standard sample deadline is assumed.

04

Production & quality documents

Input: accepted specifications and inspection/document requirements. Output: coordination of supplier schedule and the agreed drawings, reports or inspection records; availability is confirmed per order.

05

Packing & delivery

Input: roll schedule or component packing needs, destination and site restrictions. Output: agreed packing, labels, dimensions/weights, delivery terms, included costs and shipping-document requirements.

06

Support & feedback

Input: installation or operating questions and any issue records. Output: referral to the responsible supplier and follow-up within the support and warranty scope agreed for the order.

Specification review
Document requests
BOM coordination
Delivery requirements

BELTS, CORE COMPONENTS & PROJECT SUPPORT

Send your belt specification, component drawing or BOM. We coordinate supplier review of the available scope, deviations, documents and commercial terms before quotation. Complete system design, installation and EPC require a separate agreement.

EP/NN SERIESMULTI-PLY
FABRIC CONVEYOR BELTS image 1
FABRIC CONVEYOR BELTS image 2

For EP/NN fabric belts, specify the complete strength designation, ply count, covers, dimensions, roll schedule and duty. Required grades and supporting documents are checked with the supplier for the quoted configuration.

View Fabric BeltsView Fabric Belts
LONG DISTANCEHIGH TENSION
STEEL CORD CONVEYOR BELTS image 1
STEEL CORD CONVEYOR BELTS image 2

For steel cord belts, share the ST designation, covers, cord details, tension data, pulley layout, roll schedule and temperature requirements. Supplier confirmation and relevant test evidence are needed for the specified duty.

View Steel Cord BeltsView Steel Cord Belts
CHEVRONSIDEWALLPIPE
SPECIALTY CONVEYOR BELTS image 1
SPECIALTY CONVEYOR BELTS image 2

For chevron, sidewall or pipe belts, provide the route, material properties, capacity, available clearances and construction requirements. Application suitability and configuration are confirmed against the complete project data.

View Specialty BeltsView Specialty Belts
HIGH TEMPERATURESAFETY
HEAT & FIRE RESISTANT BELTS image 1
HEAT & FIRE RESISTANT BELTS image 2

For heat or fire-resistance requirements, state operating temperatures, exposure conditions, test criteria and destination-market requirements. Ask for supporting documents tied to the quoted construction; a grade name alone is not proof of suitability.

View Heat Resistant BeltsView Heat Resistant Belts
PULLEYS & IDLERSMULTI-COMPONENT RFQ
COMPONENTS & PROJECT SUPPORT image 1
COMPONENTS & PROJECT SUPPORT image 2

For pulleys, idlers and related components, submit a BOM, dimensions, drawings, installation interfaces and quantities. Items beyond the current catalog require individual availability and responsibility confirmation.

Send a BOM for scope reviewSend a BOM for scope review

MAKE THE QUOTATION EASIER TO REVIEW

Rubber lagged pulley
Impact idler
Motorized drive roller
Steel mill conveyor
PROCUREMENT CHECKS

Identify each belt or component, quantity and installation interface. Record missing information and supplier deviations so a quotation is not mistaken for complete-system design or guaranteed interchangeability.

Submit dimensions, material, finish, lagging, seals or impact-ring requirements where relevant. Options are assessed for the selected product; a generic customization list does not mean every combination is available.

Request the supplier datasheet, drawing, inspection record or test report your project needs. Confirm the issuing party, applicable product and scope before treating a document as approval.

Confirm roll or component packing, identification, dimensions, weights and destination restrictions. The quotation should identify the commercial parties, delivery location, included costs and order-specific timing.

Agree the evidence your order needs

Testing equipment close-up

Silent footage of testing equipment. The clip does not identify a test method, acceptance limit or result. Agree the required inspection documents for the quoted product or batch.

This supplier-provided equipment view gives context for inspection questions. BisonConvey coordinates document requests with partner factories. Equipment footage is not a test report, product certification or proof that a specific order has passed inspection.

Include these document requests in your inquiry

  • Supplier datasheet and the proposed product or construction designation
  • Agreed inspection scope, test methods and acceptance criteria
  • Available reports with issuing party and product, sample or batch reference
  • Dimensional checks and identification matching the packing list

Document availability, issuing party and testing scope require supplier confirmation for the quoted order.

Confirm packing before you order

Send the requirements below with your inquiry. Packing options, final dimensions, weights, costs and delivery responsibilities need supplier confirmation for the individual order; no standard roll size or damage-free delivery guarantee is assumed.

Supplier-provided packing views

Shared with website-use authorization. These views do not identify a customer delivery, prove packing strength or establish an available roll-size range. Packing and handling details are confirmed for the order.

Wrapped conveyor belt roll secured on a wooden support

Wrapping and support

Record wrapping, roll-core and support requirements with the inquiry. Confirm the proposed arrangement, packed dimensions and cost for the order.

Covered conveyor belt rolls on support frames

Roll-by-roll packing review

Match each roll ID to its agreed length, outside diameter and net/gross weight. The view illustrates an arrangement, not a maximum roll size or a handling procedure.

01Roll schedule
Separate the total purchase length from the length of each roll or endless belt. State the number of rolls and ask how any splice allowances are included in the approved schedule.
02Dimensions & weights
Request the proposed roll outside diameter, packed dimensions and net/gross weight for each item. Identify whether figures are preliminary estimates or final dispatch measurements.
03Packing arrangement
Describe required wrapping, core/reel, support or crate arrangements and any storage exposure. Ask the supplier to confirm feasibility, packing details and cost for the selected belt or components.
04Labels & document matching
Agree roll or component IDs, order/BOM references and required markings. Ask for a packing list that maps those IDs to quantities, dimensions, weights and agreed inspection documents.
05Destination & site limits
Provide the delivery location, maximum package size/weight accepted at site, access restrictions and receiving contact. Obtain product-specific handling instructions; this checklist is not a lifting plan.
06Delivery scope & costs
Check the named delivery point, responsible commercial parties, included/excluded charges and order-specific timing. Record unresolved items before accepting the quotation.

LET'S TALK